Skip to the main content.

Wastewater Treatment Facility Equipment Replacement & Inspection  

Wastewater Treatment Facility Equipment Replacement & Inspection

Wastewater Treatment Facility Equipment Replacement & Inspection  

MIG replaced primary clarifier bearings and upgraded grease lines at an Indiana wastewater facility, performing work 12 feet above ground. Key highlights include:

  • Grease lines inspected and upgraded
  • Work performed 12 feet above ground
  • Adhered to rigorous safety protocols
  • Testing and start-up ensured performance
  • Minimal disruption to plant operations
  • Specialized industrial contractor services

 

For more information download our FREE Case Study below:

 Belmont Wastewater Shadow-1



Belmon Wastewater Treatment worker
Wastewater treatment facility
Belmont wastewater treatment facility
Wastewater Treatment Piping System Maintenance & Repair

Wastewater Treatment Piping System Maintenance & Repair

Wastewater Treatment Piping Maintenance & Repair Our water/wastewater treatment piping specialists recently performed routine maintenance and minor...

Read More
Storage Tank for an Environmental Water Treatment Plant

Storage Tank for an Environmental Water Treatment Plant

Horizontal Storage Tank - Custom Fabrication Recently delivered to a California environmental water treatment facility: (1) custom fabricated...

Read More
Cold Chain Logistic Facility Lift Station

Cold Chain Logistic Facility Lift Station

Cold Chain Logistic Facility Lift Station MIG handled the fabrication, sourcing, and installation of a new lift station at a major automated...

Read More