Skip to the main content.

Wastewater Treatment Facility Equipment Replacement & Inspection  

Wastewater Treatment Facility Equipment Replacement & Inspection

Wastewater Treatment Facility Equipment Replacement & Inspection  

MIG replaced primary clarifier bearings and upgraded grease lines at an Indiana wastewater facility, performing work 12 feet above ground. Key highlights include:

  • Grease lines inspected and upgraded
  • Work performed 12 feet above ground
  • Adhered to rigorous safety protocols
  • Testing and start-up ensured performance
  • Minimal disruption to plant operations
  • Specialized industrial contractor services

 

For more information download our FREE Case Study below:

 Belmont Wastewater Shadow-1



Belmon Wastewater Treatment worker
Wastewater treatment facility
Belmont wastewater treatment facility
Cold Chain Logistic Facility Lift Station

Cold Chain Logistic Facility Lift Station

Enhance your cold chain logistics with MIG's new lift station featuring durable 316 SS piping.

Read More
Enhancing Municipal Water Systems with Advanced Treatment Technology

Enhancing Municipal Water Systems with Advanced Treatment Technology

New 150 GPM water treatment plant by MIG enhances municipal water systems with advanced technology for improved efficiency and reliability.

Read More
Valve Swap for Wastewater Treatment Plant

Valve Swap for Wastewater Treatment Plant

Our wastewater treatment plant maintenance team recently replaced eight valves at a water treatment plant in the midwest including suction valves...

Read More