Skip to the main content.
Case Study Covers (1)-Sep-15-2025-03-53-29-8556-PM

Free Case Study

Chemical Plant BAHX Replacement

Download now for an overview of our solutions, including:

  • Removed two worn BAHX cores
  • Installed new BAHX unit
  • Managed heavy equipment logistics
  • Repaired and replaced process piping
  • Integrated with plant systems
  • Enabled efficient energy transfer